Project

Vertical Transportation Upgrade (949)

Scope

This project consists of upgrades for the existing Clean Utility Cart Lift #17 serving 3rd Floor Operating Rooms and 4th Floor Labor and Delivery. The scope includes conversion of the existing manual doors to power operated doors and replacement of the controller, motor drive and cab enclosure.

Project Summary

Vertical Transportation Upgrade (949)