The project replaced existing control systems for AHU 1 and AHU 2 that supply the existing laboratories on the first floor east wing. Work included service upgrades to the air handling units and re-balancing the entire area to meet original design criteria.

Project Summary

HVAC Upgrades 1st Floor Labs (916)