East Side Energy Performance Contract - Phase I (MULTI)

Scope

This project will reduce deferred maintenance and make the buildings more energy efficient. The large lab buildings in this project have mechanical systems that are more than 25 years beyond their useful life and are no longer able to operate at original design conditions. Additionally they account for more than 25% of the energy requirements of the East Side of campus. This project will eliminate significant deferred maintenance requirements in the building and make them much more efficient, reducing their energy consumption by over 30%.

Project Summary

East Side Energy Performance Contract - Phase I (MULTI)